fbpx
           

Hot Bitumen Grouting Method

Hot Bitumen Grouting Method

Hot bitumen water-stop grouting technology was introduced from Canada by our company in 2003, for the hot bitumen grouting method used to accomplish repair of the East Railway New Yongchun Tunnel flood disaster (water pressure 40Bar, flow 80 tones / min).

Add a Comment

Your email address will not be published. Required fields are marked *