Feitsui Reservoir Dam Leakage Sealing Work

Feitsui Dam has a height of 122.5 meters.The dam structure is directiondouble curve concrete arch, consisting of 29 separate sub-blocks.Dueto leakage through part of the block joints,work was needed to stop thisflow.So as that this project, in 1995, was proceeded to overcome this problem.The polyurethane resin injection was selected as the approach for this project.The

Ming–Tarn Dam Leakage Sealing Project

The Mingtan Power Plant has a 58-meter-high concrete gravity dam. Verticalcontraction joint leakage problems occurred, and with the water level at itshighest, the leakage rate was 2,100L/min.The main challenge of the project was how to achieve water stoppage effect, without blocking the original drainage pipes buried in the contraction joints.The solution to the water leakageproblem

Wanda Power Plant Cofferdam Site Improvement

To expand the Wanda Power Plant with the addition of No. 4 generator unit,an additional water intake facility had to be constructed at Wanda Reservoir.As the reservoir was still needed to continue its water storage function, it wasnecessary to carry out grouting of the cofferdam in two stages to retain the water,then two phases of