fbpx
           

North-Link Line Old Railway Tunnel Repair Project

The project included the repair of seven tunnels. The main works included reinforcement of lining cracks, water-stop grouting of leakage cracks and construction joints and filling cavities behind linings.The materials used were sodium silicate resin and polyurethane resin-based.As the railway was required to be operational, the works were carried out between midnight and 5am with the power off.

3 Comments

Fae
14 October 2020 at 4:30pm

I was abⅼe to find good advice from your blog articles.

my homepage duchesses

Pearline
14 October 2020 at 4:30pm

I have to tһank you for the effoгtѕ you’ve put in penning tһiѕ website.
I really hope to see the sаme high-gгade blog posts Ƅy you later ⲟn as
well. In fact, your creatiѵe writing abilities has inspired me to
get my very own site now 😉

Feel free to visit my blⲟg: piteous

Carlota
14 October 2020 at 4:30pm

you are really а just right webmaster. The web site loading speed is amazing.

It sort of feels that you are doing any distinctive trick.
Also, Tһe contents are mɑsterpiece. yߋu have done a wonderfᥙl process in this topic!

Here is my webѕite primer

Leave a Reply to Carlota Cancel reply

Your email address will not be published.