fbpx
           

Wansong Hydroelectric Power Project

Full grouting throughout the whole tunnel (about 7.8km), including consolidation grouting, water-seal grouting, pumping collapse grouting, gas escape sealing grouting, rock plate extrusion deformation treatment, grout injection into collapsed hole layer and backfill grouting after works completion, and so on.

Leave a Reply

Your email address will not be published.