fbpx
           

Dajia River Power Plant I-B Project

Dajia River power plant Qingshan branch Reconstruction Major Project I-B-beforeexcavation of the tunnel mouth, drilling and consolidation grouting works were carried out.Before excavation of the disaster section, handling of shaft excavation and gushing water, coring exploration, water stop consolidation drilling and grouting (resin, cement and chemical), 4-inch drainage hole drilling were done.After completion of the lining, and systematic backfill and consolidation grouting, the company wasinvolved in design, planning and construction.

Leave a Reply

Your email address will not be published.