「The site is adjacent to the MRT main line and elevated roads, and it was being constructed by the Top-Down method, with 6 basements. When excavating the basement floor 4 during construction, an unknown buried pipe that was incompletely blocked in the base was encountered, resulting in serious water inrush at the excavation site … 」